Tahkoluoto
FSS involved in installation operation of the Finland’s first 2.3 MW wind power plant in 2010, which was built on the open sea in Tahkoluoto, Pori. Later Suomen Hyötytuuli Oy built ten 4.2 MW offshore wind farms around it, where Finnish Sea Service Oy was responsible for the installation of subsea cables. The offshore wind farm is the first in the world to be built for ice conditions.